Engineering
Engineering, 03.06.2021 21:20, gracieorman4

A project has an initial cost of $100,000 and uniform annual benefits of $12,500. At the end of its 8-year useful life, its salvage value is $30,000. At a 10% interest rate, the net present worth of the project is approximately: 1- $-19,318
2- $0
3- $+30,000
4- $+100,000

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, wirchakethan23
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i. d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
image
Engineering, 04.07.2019 18:20, krojas015
Asolid cylinder is concentric with a straight pipe. the cylinder is 0.5 m long and has an outside diameter of 8 cm. the pipe has an inside diameter of 8.5 cm. the annulus between the cylinder ad the pipe contains stationary oil. the oil has a specific gravity of 0.92 and a kinematic viscosity of 5.57 x 10-4 m2/s. most nearly, what is the force needed to move the cylinder along the pipe at a constant velocity of 1 m/s?
Answers: 3
image
Engineering, 04.07.2019 19:20, GusGus11
The power source in a certain welding setup generates 3500w that is transferred to the low carbon steel work with a heat transfer factor of 0.85. the melting factor in the operation is 0.45. a continuous fillet weld is to be made with a cross-sectional area of 23 mm2 determine the travel speed at which the welding can be accomplished.
Answers: 3
image
Engineering, 04.07.2019 19:20, ameliaxbowen7
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
Do you know the correct answer?
A project has an initial cost of $100,000 and uniform annual benefits of $12,500. At the end of its...

Questions in other subjects:

Konu
History, 18.01.2021 05:30
Konu
Mathematics, 18.01.2021 05:30
Konu
Mathematics, 18.01.2021 05:30
Konu
Arts, 18.01.2021 05:30