Engineering
Engineering, 26.05.2021 17:30, kkneedz1369

A nonpipelined system takes 300ns to process a task. The same task can be processed in a 5-segment pipeline with a clock cycle of 60ns. Determine the speedup ratio of the pipeline for 100 tasks. What is the maximum speedup that could be achieved with the pipeline unit over the nonpipelined unit

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, alyssabailey7545
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
image
Engineering, 04.07.2019 18:20, CelesteN64
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
Do you know the correct answer?
A nonpipelined system takes 300ns to process a task. The same task can be processed in a 5-segment p...

Questions in other subjects:

Konu
Physics, 21.05.2021 18:20