Engineering, 25.05.2021 18:40, chimwim8347

The open-circuit and shot-circuit tests are performed on a 240-kVA, 4800/240-V, 60-Hz transformer. The obtained data are as follows. Voltage, V Current, A Power, W Open-circuit test 240 9.7 1440 Short-circuit test 188.6 50.2 2625 1) Determine the parameters of the approximate equivalent circuit as referred to the high-voltage side. Draw the circuit showing the pertinent parameters. 2) Find the efficiency when the transformer is operating at 97% of its rated load, 0.78 power factor lagging and rated terminal voltage. 3) Calculate the load kVA at maximum efficiency and the transformer efficiency for this load kVA at 0.78 power factor lagging.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:10, agpraga23ovv65c
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
Do you know the correct answer?
The open-circuit and shot-circuit tests are performed on a 240-kVA, 4800/240-V, 60-Hz transformer. T...