Engineering
Engineering, 19.05.2021 15:20, misslux

The cost to rent a video game for 3 days was $10. It costs the same amount each day. How could one find the cost to rent the video for one day?

The cost to rent for one day is the sum of $10 and 3.
The cost to rent for one day is the quotient of $10 and 3.
The cost to rent for one day is the difference of $10 and 3.
The cost to rent for one day is the product of $10 and 3.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:20, ashleyjaslin
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
image
Engineering, 04.07.2019 19:10, kimmy6973
What is creep? what is stress relaxation?
Answers: 1
image
Engineering, 04.07.2019 19:10, netflixacc0107
What is the major difference between thermoplastics and thermosetting plastics from the polymerization structure point of view?
Answers: 2
Do you know the correct answer?
The cost to rent a video game for 3 days was $10. It costs the same amount each day. How could one...

Questions in other subjects: