Engineering
Engineering, 10.05.2021 21:20, lizzy2951

Need fast 30 pointsProject: Researching Materials, Time, and Cost for Product Modifications Assignment Directions

When a client approaches an engineer about a project, the engineer might not have all of the information available to create a bid proposal. The engineer might need to research time, cost, and materials needed to complete the project. Take a moment to think of an everyday object. It could be a stapler, a fork, or even a shoe. You must choose two of the three analyses (time, cost, or materials) to research for your chosen object. Once you have completed the research, you will present the documentation and explain your findings in a script for a 3- to 5-minute oral presentation. Remember that a bid proposal is intended to persuade a client to use your services, so be sure to use persuasive techniques to convince your audience to choose your bid proposal.

Assignment Guidelines

Each script for a 3- to 5-minute presentation must include two of the following:

cost analysis
materials analysis
time analysis
Each analysis must include graphic representation.

Submission Requirements

One to two pages double spaced

Proper grammar and vocabulary

Question # 1

File Upload
Upload your presentation that demonstrates your analyses from your research on time, cost, and/or materials for your object (choose two).

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, DestyHilBan1183
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:20, myahlit84
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:20, annette211pdd8v9
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
Do you know the correct answer?
Need fast 30 pointsProject: Researching Materials, Time, and Cost for Product Modifications Assign...

Questions in other subjects:

Konu
Mathematics, 16.04.2020 17:07
Konu
Mathematics, 16.04.2020 17:07