As a Professional Engineer in an environmental engineering firm, you are asked to provide an outline of steps in designing a storm water detention facility for a neighborhood watershed. The outflow from the detention pond needs to be taken under a road through a culvert. You are given: (a) the USGS topography map, (b) NRCS soil survey and land use map and c) road elevation and tailwater elevation. Based on this information briefly guide me through the process of developing a detention pond and the culvert for this urban watershed.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160Ā°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Do you know the correct answer?
As a Professional Engineer in an environmental engineering firm, you are asked to provide an outline...

Questions in other subjects:

Konu
Mathematics, 07.04.2021 05:00
Konu
Mathematics, 07.04.2021 05:00
Konu
Mathematics, 07.04.2021 05:00
Konu
Mathematics, 07.04.2021 05:00
Konu
Business, 07.04.2021 05:00