Engineering, 02.05.2021 20:20, LizaB15

A mixture of 0.3 kg of carbon dioxide and 0.2 kg of nitrogen is compressed from p1 = 1 bar, T1 = 300 K to p2 = 3 bars in a polytrophic process for which n = 1.25. Determine (a) the final temperature, in K, (b) the work, in kJ, (c) the heat transfer, in kJ, (d) the change in entropyof the mixture, in kJ/K.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, Larkinlover703
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
image
Engineering, 04.07.2019 19:10, justkevin1231
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?