Which of the following is the best design choice? Assume the budget is $120 and that weight includes the payload. a
Tmax = 11.0 N, W = 8.0 N, Cost = $95
b
Tmax = 12.0 N, W = 8.0 N, Cost = $105
c
Tmax = 16.0 N, W = 8.0 N, Cost = $112
d
Tmax = 18.0 N, W = 8.2 N, Cost = $125

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, hadellolo8839
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, anna22684
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
image
Engineering, 04.07.2019 18:10, wyattlb97
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Do you know the correct answer?
Which of the following is the best design choice? Assume the budget is $120 and that weight includes...

Questions in other subjects: