Engineering, 19.04.2021 16:00, xojade

3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. The peak demand is 0.578 m3 /s. Determine the required diameter of ductile-iron pipe such that the flow velocity during peak demand is 2.5 m/s. Round the pipe diameter upward to the nearest 25 mm (i. e., 25 mm, 50 mm, 75 mm, . . .). The water pressure at the development is to be at least 140 kPa during peak demand. If the water at the treatment plant is stored in a ground-level reservoir where the level of the water is 10.00 m NGVD and the ground elevation at the suburban development is 8.80 m NGVD, determine the pump head that must be available to meet peak demands. (*NGVD

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 03.07.2019 15:10, EmilySerna
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
Do you know the correct answer?
3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. T...

Questions in other subjects:

Konu
History, 06.10.2019 15:30
Konu
Biology, 06.10.2019 15:30
Konu
Mathematics, 06.10.2019 15:30