Engineering
Engineering, 06.04.2021 20:10, rosepabon

Wall covering materials, such as drywall are wall framing with A. self-tapping drywall screws B. ring-shank drywall nails C. powder-actuated tool D. All of the above are commonly used. med walls is 1161111 factone​

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 18:20, rocio5649
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa. s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
image
Engineering, 04.07.2019 19:10, brid7931
Aplate of dimensions 3 m x 3 m is placed 0.37 mm apart from a fixed plate. the plate requires a force of 2n to move at speed of 45 cm/s. evaluate the viscosity of the fluid in between the plates
Answers: 3
Do you know the correct answer?
Wall covering materials, such as drywall are wall framing with A. self-tapping drywall screws B. rin...

Questions in other subjects:

Konu
History, 24.11.2020 22:50
Konu
Mathematics, 24.11.2020 22:50