Engineering, 06.04.2021 06:40, leah7378

Some project managers prefer the PERT chart over the Gantt chart because it clearly illustrates task dependencies. A PERT chart, however, can be much more difficult to interpret, especially on complex projects. Alternatively, some project managers may choose to use both techniques. If you are the project manager of a residential construction project, will you prefer PERT chart to Gantt chart? Explain why?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, Fahaddie
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
Do you know the correct answer?
Some project managers prefer the PERT chart over the Gantt chart because it clearly illustrates task...

Questions in other subjects:

Konu
Mathematics, 21.02.2020 18:29