You are the scheduler for a large commercial building project. The schedule that you prepared (based on feedback from the project manager) falls 15 days short of the owner’s deadline. The project manager decides to write a memo to all of the subcontractors, requiring them to work 6 days per week, 10 hours per day. You ask the project manager to wait until you determine the most efficient way to crash the project. Summarize your argument in 4 short items to convince the project manager to go with a certain accelerating plan that focuses on the critical path and not all activities.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, DestyHilBan1183
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
image
Engineering, 04.07.2019 18:10, chadatkin
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
Do you know the correct answer?
You are the scheduler for a large commercial building project. The schedule that you prepared (based...

Questions in other subjects:

Konu
Mathematics, 25.02.2022 18:50
Konu
Computers and Technology, 25.02.2022 18:50