In order to properly construct this road you have determined that you need to bring in 135,000 CCY of fill material to construct the sub-base. The fill material that is available is dry earth, with a weight of 2800 lbs/BCY and a moisture content of 7%. The percent swell for this soil is 25%. The final compaction level will be 118 PCF dry density and the optimum moisture content is 6%. How many BCY of earth must be excavated to meet this requirement

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 03.07.2019 14:10, kayabwaller4589
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
Do you know the correct answer?
In order to properly construct this road you have determined that you need to bring in 135,000 CCY o...

Questions in other subjects:

Konu
World Languages, 01.10.2019 06:30
Konu
Biology, 01.10.2019 06:30