A computerized design facility has a first cost of $750K. The annual O&M is $100K. The salvage value in year 40 is $5K. Computer monitor replacement will cost $250K every 8 years, and other hardware and software will need replacement every 4 years for $300K. If i = 12%, find the EAC for the 40-year horizon.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, CelesteN64
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
image
Engineering, 04.07.2019 18:20, krojas015
Asolid cylinder is concentric with a straight pipe. the cylinder is 0.5 m long and has an outside diameter of 8 cm. the pipe has an inside diameter of 8.5 cm. the annulus between the cylinder ad the pipe contains stationary oil. the oil has a specific gravity of 0.92 and a kinematic viscosity of 5.57 x 10-4 m2/s. most nearly, what is the force needed to move the cylinder along the pipe at a constant velocity of 1 m/s?
Answers: 3
image
Engineering, 04.07.2019 18:20, maustin5323
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
image
Engineering, 04.07.2019 19:10, jennymares
Abarometer contains mercury with a density of 13600 kg/m3. atmospheric conditions are 95.8 kpa and 20 °c at 20 °c, the vapor pressure of the mercury is 0.000173 kpa. the column of mercury will rise to a height of most nearly. select one: a)- 0.38 m b)- 0.82 m c)- 0.48 m d)- 0.72 m
Answers: 1
Do you know the correct answer?
A computerized design facility has a first cost of $750K. The annual O&M is $100K. The salvage v...

Questions in other subjects:

Konu
English, 05.02.2021 20:20
Konu
Spanish, 05.02.2021 20:20
Konu
English, 05.02.2021 20:20