Develop a preliminary WBS for a small one-story commercial building to be constructed on the site of an existing small- frame structure. It is 30 by 60 feet in plan. The 110 Project Planning exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing. The ceiling is suspended acoustical tile. The floor is a concrete slab on grade with an asphalt tile finish. Interior finish on all walls is paint. Required:
a. Show the first level of this structure for the total project (WBS is developed from top to the bottom).
b. Draw one work package (or building system) of the first level and develop the second-level structure for this work package.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 18:20, annette211pdd8v9
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
Do you know the correct answer?
Develop a preliminary WBS for a small one-story commercial building to be constructed on the site of...

Questions in other subjects:

Konu
Mathematics, 20.04.2021 20:30
Konu
Mathematics, 20.04.2021 20:30