Engineering
Engineering, 11.02.2021 20:30, martl4175

Consider a hilly area in which new homes are being constructed. As rain falls on the site, without any controls, water running off the site would carry eroded soil particles to a nearby creek, polluting it badly. A detention pond is built to catch the particle-laden runoff at the bottom of the hill, to allow the soil particles to accumulate in the bottom of the pond while cleaner water overflows out of the pond and into the creek. For simplicity, assume that the rain is steady, all flows are steady, and ignore any transient effects on pond and water concentrations of soil particles. The water generated by the rain storm has a flow rate of 5.00 m3/min and entrains a concentration of particles of 4000. mg/L as it runs over the land. The nearby creek has a flow rate of 120. m3/min and normally carries an ambient concentration of 15.0 mg/L of soil particles. The detention pond will catch and remove most of the soil particles from the runoff, leaving outflow water (the water exiting the pond and flowing to the creek) with a concentration of 400. mg/L. Assume that 5% of the water that comes into the pond will seep down through the bottom (filtering out all particles), while the rest will over flow into the creek. a. Calculate the mass of mud accumulated in the detention ponds after three hours of this rainfall/runoff.
b. Calculate the concentration of particles in the creek after mixing with the overflow from the pond.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, Tyrant4life
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Do you know the correct answer?
Consider a hilly area in which new homes are being constructed. As rain falls on the site, without a...

Questions in other subjects:

Konu
Social Studies, 28.04.2021 18:40
Konu
Health, 28.04.2021 18:40
Konu
Mathematics, 28.04.2021 18:40