Engineering
Engineering, 02.02.2021 05:10, ira51

The steel framework is used to support the reinforced stone concrete slab that is used for an office. The slab is 200 mm thick. Calculate the value of the distributed load on BE. Take a = 2 m, b = 5 m. Assume density for concrete slab = 23.6 kN/m3. Hint: Look at Example 2 from class notes.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 19:10, Mimidj9279
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 03:10, DeathFightervx
Air is flows through an adiabatic nozzle with an inlet pressure of 400 psia at a temperature of 300Ā°f and a velocity of 20 ft/s. the outlet pressure is 40 psia and the velocity is 800 ftl/s. determine the outlet temperature of the air using: a) property tables b) specific heat (using the specific heat value for air at 300Ā°f)
Answers: 3
Do you know the correct answer?
The steel framework is used to support the reinforced stone concrete slab that is used for an office...

Questions in other subjects:

Konu
Mathematics, 04.09.2020 22:01
Konu
Social Studies, 04.09.2020 22:01