Engineering
Engineering, 29.01.2021 01:00, ottie123

) Two balanced Y-connected loads, one drawing 15 kW at 0.9 power factor lagging and the other 20 kW at 0.8 power factor leading, are connected in parallel and supplied by a balanced three-phase Y-connected, 480-V source. (a) Determine the source current. (b) If the load neutrals are connected to the source neutral by a zero-ohm neutral wire through an ammeter, what will the ammeter read

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, kendrawalraven
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
image
Engineering, 04.07.2019 19:10, netflixacc0107
What is the major difference between thermoplastics and thermosetting plastics from the polymerization structure point of view?
Answers: 2
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:10, kayleeemerson77
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
Do you know the correct answer?
) Two balanced Y-connected loads, one drawing 15 kW at 0.9 power factor lagging and the other 20 kW...

Questions in other subjects:

Konu
Mathematics, 11.11.2020 18:00
Konu
Mathematics, 11.11.2020 18:00
Konu
Mathematics, 11.11.2020 18:00
Konu
Physics, 11.11.2020 18:00
Konu
Mathematics, 11.11.2020 18:00
Konu
Mathematics, 11.11.2020 18:00