Engineering
Engineering, 27.01.2021 20:10, cadanceowasso

A ten story hospital has to constructed with the footprint of 45,000 ft^2. Subsurface soil consist of soft clay layer of 10 ft. Deep pile foundation will be used for supporting the building. The depth of pile foundation will be the 15ft. Required:
a. Determine number of the boring to be used for the subsurface investigation using NYC Code Mandate discussed in the class.
b. Also determine the depth of the boring to be used for subsurface investigation.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
Do you know the correct answer?
A ten story hospital has to constructed with the footprint of 45,000 ft^2. Subsurface soil consist o...

Questions in other subjects:

Konu
Mathematics, 30.11.2019 03:31
Konu
Biology, 30.11.2019 03:31