Engineering
Engineering, 27.01.2021 02:00, carbpotatoes

In architectural drawings, what do architects use to convey exact details about various parts of a drawing without leaving any scope for misinterpretation?

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, miguel454545
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
image
Engineering, 04.07.2019 19:20, nikkiebartels
Afan that can provide air speeds up to 60 m/s is to be used in a low-speed wind tunnel with atmospheric air at 35 c. if one wishes to use the wind tunnel to study flat-plate boundary layer behavior up to reynolds numbes of re 10, what is the minimum plate length that should be used? at what distance from the leading edge would transition occur if the critical reynolds nurnber were rer, e = 5 × 105?
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 05.07.2019 23:20, neisha2507
Which one of the following faults cause the coffee in a brewer to keep boiling after the brewing cycle is finished? a. an open circuit in the heating element b. a short circuit at the terminals c. welded contacts on the thermostat d. a leak around the gasket
Answers: 3
Do you know the correct answer?
In architectural drawings, what do architects use to convey exact details about various parts of a d...

Questions in other subjects:

Konu
Social Studies, 16.10.2020 07:01
Konu
History, 16.10.2020 07:01
Konu
Mathematics, 16.10.2020 07:01