Engineering
Engineering, 24.01.2021 22:30, MaliaHale

A new construction firm completed its first project of a residential building. But a few months later, the building developed cracks, and eventually the entire building crumbled to the ground. What caused the building to fall? A. Poor air conditioning
B. Weak walls
C. External force
D. Furniture

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, hadellolo8839
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
image
Engineering, 04.07.2019 19:20, brae72
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
image
Engineering, 06.07.2019 02:30, josediaz1124
Around steel bar, made from material with a yield stress of 750mpa, is loaded so that it has stresses co locations of maximum normal stress and maximum shear stress. use maximum shear stress and maximum distortion energy theories to calculate the safety factors for initial yielding failures.
Answers: 3
Do you know the correct answer?
A new construction firm completed its first project of a residential building. But a few months late...

Questions in other subjects:

Konu
Mathematics, 01.10.2019 09:30
Konu
Mathematics, 01.10.2019 09:30