Engineering
Engineering, 14.01.2021 14:00, bellbug08

A fire watch must be held for at least after completion of welding and cutting A- 1 Day
B- 4 hours
C- 30 minutes

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
image
Engineering, 05.07.2019 10:10, johns2380
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
Do you know the correct answer?
A fire watch must be held for at least after completion of welding and cutting A- 1 Day
B- 4...