Engineering
Engineering, 31.12.2020 16:10, gymnastattack

Exercises Complete the description of the action-reaction pair of
forces for the diagram.
Force A: The gas pushes on the
Force B: The rocket pushes on the

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 03:10, brookealexis5768
Oxygen at 300 kpa and 400 k is in a closed system with an initial volume of 0.1 m3. is now compressed in a polytropic process, with exponent of n 1.2, to a temperature of 500 k. calculate: a) the boundary work done during the compression, in kj b) the heat transfer during the compression, in kj
Answers: 3
image
Engineering, 06.07.2019 03:20, crazylife77
What is the strain energy stored in a solid uniformly circular shaft of length 3.0 m and diameter 120 mm when subject to pure torsion if the maximum shear stress is 40 mpa? g-80gpa
Answers: 1
Do you know the correct answer?
Exercises Complete the description of the action-reaction pair of
forces for the diagram.

Questions in other subjects: