1- (50 points) Consider the following soil profile. If a fill with unit weight of 120 lbf/ft3 and height of 10 ft is planned to be placed on the field, estimate: a) The primary consolidation settlement if the preconsolidation stress is 1100 psf. b) The degree of consolidation and the corresponding settlement six months after loading. c) The time (in minutes) that it takes for a 1-in-thick lab specimen of this soil to get to the same degree of consolidation as the field. d) The secondary and total consolidation 6 years after placement of the fill if the time to complete primary consolidation is 1.6 years.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 08:10, doggo242
Which of the following is an easy way to remember the modified β€œx” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false