Engineering, 23.12.2020 21:10, nuconteaza119
Problem.5A light commercial building located in Philadelphia, Pa has construction and use characteristics much like a residence and design heating load of 120,000 Btu/h and cooling of 60,000 Btu/h. Determine the following: (a) Heating energy requirement, Btu(b) Gallons of No. 2 fuel oil/year, assuming efficiency of the furnace is 75 %(c) Cubic feet of natural gas/year(d) kWh of electricity for cooling for air conditioner with SEER of 8.5 using degree day method.(6 points)
Answers: 3
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Engineering, 04.07.2019 18:20, CelesteN64
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
Engineering, 04.07.2019 18:20, Doogsterr
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
Problem.5A light commercial building located in Philadelphia, Pa has construction and use characteri...
English, 25.09.2020 18:01
Mathematics, 25.09.2020 18:01
History, 25.09.2020 18:01
Mathematics, 25.09.2020 18:01
Mathematics, 25.09.2020 18:01