Engineering
Engineering, 15.12.2020 16:20, jazzclark79

Estimate the heating energy requirements for a residential building using the degree-day method (a) in Denver, Colorado, and (b) in Little Rock, Arkansas. The overall heat loss coefficient is 400 Btu/h. oF and the furnace efficiency is 0.78.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, rbgrh9465
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
image
Engineering, 04.07.2019 19:20, anggar20
Air enters a horizontal, constant-diameter heating duct operating at steady state at 290 k, 1 bar, with a volumetric flow rate of 0.25 m°/s, and exits at 325 k, 0.95 bar. the flow area is 0.04 m2. assuming the ideal gas model with k = 1.4 for the air, determine (a) the velocity at the inlet and exit, each in m/s, and (c) the rate of heat transfer, in kw flow rate, in kg/s, (b) the mass kg 0.3
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 04.07.2019 19:20, lovenahofer
Apreheater involves the use of condensing steam at 100°c on the inside of a bank of tubes to heat air that enters at 1 atm and 25°c. the air moves at 5 m/s in cross flow over the tubes. each tube is 1 m long and has an outside diameter of 10 mm. what is the minimum value of nl needed to achieve an outlet temperature of t 75 c? what is the corresponding pressure drop across the tube bank?
Answers: 3
Do you know the correct answer?
Estimate the heating energy requirements for a residential building using the degree-day method (a)...

Questions in other subjects: