Engineering
Engineering, 02.12.2020 01:00, amiechap12

Calculate the total quantity of bricks, with 2% waste factor, required to be placed in a foundation wall, whose Perimeter of the Wall is 207 ft 4 in.; Height of Wall is 9 ft.; and 8" Wall Thickness, using Common Bond. There are 9 Windows that are 4 ft. by 4 ft. and 1 door that is 4 ft. by 6.5 ft high. Given: Brick size is 8" x 2-1/4" x 3-3/4"
Size of Mortar Joint is 1/2"

what's the anwser?

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, kevin72836
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
image
Engineering, 04.07.2019 18:10, ijohnh14
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Do you know the correct answer?
Calculate the total quantity of bricks, with 2% waste factor, required to be placed in a foundation...

Questions in other subjects:

Konu
Mathematics, 02.12.2021 04:20
Konu
Computers and Technology, 02.12.2021 04:20
Konu
Mathematics, 02.12.2021 04:20
Konu
Health, 02.12.2021 04:20
Konu
Mathematics, 02.12.2021 04:20
Konu
Mathematics, 02.12.2021 04:20