Engineering
Engineering, 30.11.2020 03:50, mattotto1758

A heating system, a lightning, and a motor load circuit of a small warehouse establish an 18-KVA power demand at 0.487 power factor lagging on a 220 V, 60 Hz supply. a) Establish the power triangle for the load. b) Determine the power factor capacitor that must be place in parallel with the load to raise the power factor to 0.865 lagging. c) Determine the change in supply current from the uncompensated to the compensated system d) Determine the power factor capacitor that must be placed in parallel with the load to raise the power factor to unity

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 19:10, Lexi5170
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b. s. and b. s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
Do you know the correct answer?
A heating system, a lightning, and a motor load circuit of a small warehouse establish an 18-KVA pow...