Engineering
Engineering, 16.11.2020 17:00, Hudman57

A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly from a large constant-voltage bus. In the short-circuit test, the recorded values on the high- voltage side for one of these transformers are: VSC = 560 V ISC = 12.6 A PSC = 3300 W (a) If this bank delivers a rated load at 0.88 PF lagging and rated voltage, what is the line-to-line voltage on the primary of the transformer bank?(b) What is the voltage regulation under these conditions?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 04.07.2019 18:20, 3076850
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i. e., a violation of one statement leads to the violatio the other statement)
Answers: 2
Do you know the correct answer?
A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly fro...

Questions in other subjects:

Konu
Mathematics, 15.12.2020 08:00
Konu
Mathematics, 15.12.2020 08:00
Konu
Mathematics, 15.12.2020 08:00
Konu
Mathematics, 15.12.2020 08:00
Konu
Computers and Technology, 15.12.2020 08:00