Engineering
Engineering, 09.11.2020 04:30, tamikalove78

In the XYZ Company's automatic screw machine department, five machines are assigned to each operator. On a given job, the machining time per piece is 0.164 hours and the machine servicing time is 0.098 hours. With an operator rate of $12.80 per hour and a machine rate of $14 per hour, calculate the expected cost per unit of output.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
image
Engineering, 04.07.2019 18:10, namira16
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
image
Engineering, 04.07.2019 18:20, esmemaluma00
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
Do you know the correct answer?
In the XYZ Company's automatic screw machine department, five machines are assigned to each operator...

Questions in other subjects: