If 40 men build 4 buildings in 12 months, how many men would be required to build 6 houses in 4 months? Plz with formula

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
image
Engineering, 04.07.2019 18:10, niicoleassssssf
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
Do you know the correct answer?
If 40 men build 4 buildings in 12 months, how many men would be required to build 6 houses in 4 mont...

Questions in other subjects:

Konu
Mathematics, 27.08.2020 18:01
Konu
Spanish, 27.08.2020 18:01