3
Select the correct answer.
Which axes define the rotational movement of a CNC system?
...
![Engineering](/tpl/images/cats/User.png)
Engineering, 30.10.2020 18:30, bando187
3
Select the correct answer.
Which axes define the rotational movement of a CNC system?
Ο Α.
X-axis, y-axis, Z-axis
OB
X-axis, Y-axis, Z-axis
Ос.
A-axis, B-axls, and C-axis
OD
L-axis, M-axis, and N-axis
Reset
Next
![answer](/tpl/images/cats/otvet.png)
Answers: 2
Other questions on the subject: Engineering
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, alyssabailey7545
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
![image](/tpl/images/cats/User.png)
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10, rayne40
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
Do you know the correct answer?
Questions in other subjects:
![Konu](/tpl/images/cats/fizika.png)
Physics, 10.08.2021 07:10
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 10.08.2021 07:10
![Konu](/tpl/images/cats/himiya.png)
![Konu](/tpl/images/cats/pravo.png)
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 10.08.2021 07:10
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
Mathematics, 10.08.2021 07:10