Engineering
Engineering, 29.10.2020 17:00, amandasantiago2001

For a steel alloy it has been determined that a carburizing heat treatment of 10 h duration at 753°C will raise the carbon concentration to 0.50 wt% at a point 3.3 mm from the surface. Estimate the time necessary to achieve the same concentration at a 5.6 mm position for an identical steel and at a carburizing temperature of 1060°C. Assume that D0 is 3.2 × 10-5 m2/s and Qd is 104 kJ/mol.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, EmilySerna
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
image
Engineering, 04.07.2019 18:10, koolgurl2003
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
image
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
Do you know the correct answer?
For a steel alloy it has been determined that a carburizing heat treatment of 10 h duration at 753°C...

Questions in other subjects:

Konu
Mathematics, 15.12.2020 09:10
Konu
Mathematics, 15.12.2020 09:10
Konu
Chemistry, 15.12.2020 09:10