Engineering
Engineering, 16.10.2020 14:01, waterborn7152

Technician A says that primer surface will dry faster if it is sprayed in several coats with flash time between each coat. Technician B says that there will be better adhesion if several coats are applied in just one application, then allowed to dry for several hours. Who's right?

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
Do you know the correct answer?
Technician A says that primer surface will dry faster if it is sprayed in several coats with flash t...

Questions in other subjects:

Konu
Social Studies, 29.01.2021 21:40
Konu
Mathematics, 29.01.2021 21:40
Konu
Mathematics, 29.01.2021 21:40
Konu
Mathematics, 29.01.2021 21:40
Konu
English, 29.01.2021 21:40