Engineering
Engineering, 23.09.2020 06:01, RainbowPieWasHere

The following are cross-section notes for a transition from cut to fill. The roadbed is 12 m wide in cut and 14 m wide in fill. Side slopes are 1:2. Compute volumes of cut and fill by the average end area method or pyramid volume as appropriate. Find the net amount of waste or borrow, allowing 12% shrinkage for material excavated and placed in embankments. Borrow should be expressed in fill meters and waste in cut meters.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, brooklyn674
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
image
Engineering, 04.07.2019 19:10, Calliedevore
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
Do you know the correct answer?
The following are cross-section notes for a transition from cut to fill. The roadbed is 12 m wide in...

Questions in other subjects:

Konu
Mathematics, 12.08.2020 04:01