Question 2: (30 Points) For the problem shown in the below figure.
1. If the resultant force acting on the support is to be 1200 lb., directed horizontally to the right,
Determine the force F in Rope A and the corresponding angle 0. (20 points)
2. Explain the steps of solving this problem one by one. (5 points)
3. Net drawing of the free body diagram. (5 points)
B
60°
900 lb

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 19:20, brae72
Asimple speed reducer is composed of 2 spur gears. the pinion gear has a pitch diameter of 0.75" and 36 teeth while the driven gear has a pitch diameter of 4.0" and 192 teeth. a)-what is the diametral pitch of each gear? b)-if an electric motor rotating ccw at 3000 rpm is coupled to the pinion, what is the rotational speed of the driven gear? c)-if the torque delivered to the pinion is 1 n-m, what is the torque on the driven gear? d)-what is the power transmitted by the gear train?
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.