Consider an economic order quantity case where monthly demand is 125 units, working days in a month are 25 days, economic order quantity is 210 units, the desired service level is 0.95, the standard deviation of demand during lead time is 20 units, and lead time is 13 days. Determine the reorder point.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, salazjlove
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
Do you know the correct answer?
Consider an economic order quantity case where monthly demand is 125 units, working days in a month...

Questions in other subjects:

Konu
Social Studies, 18.02.2020 05:00
Konu
History, 18.02.2020 05:00