Engineering
Engineering, 17.08.2020 01:01, Aviannakelly

If Rf=10, CfCfCf=10 and R1R_1R1 = 5, What is the bandwidth in radians per second?

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 19:10, gabrielaperezcz
Air inially occupying a volume of 1 m2 at 100 kpa, 27 c undergoes three internally reversible processes in series. process 1-2 compression to 500 kpa during which pv constant process 2-3 adiabatic expanslon to 100 kpa process 3-1: constant-pressure expansion to 100 kpa (a) calculate the change of entropy for each of the three processes. (b) calculate the heat and work involved in each process. (c) is this cycle a power cycle or refrigeration cycle?
Answers: 3
image
Engineering, 04.07.2019 19:20, horsedoggal1234
Consider airflow over a flat plate of length l = 1.5 m under conditions for which transition occurs at le = 0.9 m based on the critical reynolds number, re, e = 5 x 10. evaluating the thermophysical properties of air at 400 k, determine the air velocity. (hint: use the tables to find the properties of air)
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
Do you know the correct answer?
If Rf=10, CfCfCf=10 and R1R_1R1 = 5, What is the bandwidth in radians per second?...

Questions in other subjects:

Konu
Social Studies, 23.09.2019 18:30
Konu
Mathematics, 23.09.2019 18:30