Engineering, 03.08.2020 14:01, m3lissa

A complex Brayton-cycle power plant using intercooling, reheat, and regeneration is analyzed using the cold air standard method. Air is compressed from State 1 to State 2 using a compressor with a pressure ratio of RP1. An intercooler is used to cool the air to State 3 before entering a second compressor with a pressure ratio of RP2. The compressed air exits at State 4 and is preheated in a regenerator that uses the exhaust air from the low pressure turbine. The preheated air enters the combustor at State 5 and is heated to State 6 where it enters the high pressure turbine. The air exits the turbine at State 7 and is heated in a reheat combustor to State 8. The air expands in a low pressure turbine to State 9 where it enters the counterflow regenerator with an effectiveness of RE. Given the specified operating conditions determine the efficiency and other values listed below. The specific heat ratio and gas constant for air are given as k

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
image
Engineering, 04.07.2019 18:10, heidiburgos1own6c0
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, anna22684
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
image
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Do you know the correct answer?
A complex Brayton-cycle power plant using intercooling, reheat, and regeneration is analyzed using t...