Engineering
Engineering, 05.07.2020 16:01, linnybear300

Find the Register A contents for the following program. LDAA #$7C
ADDA #$84
BEQ Over ;Branch equal
LDAA #$FF
BRA EXIT
Over: LDAA #$99
EXIT NOP

A=00
A= $FF
A= $99
None

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, esmemaluma00
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
image
Engineering, 04.07.2019 19:10, jimena15
10 kg of co2 is initially contained at 400 kpa and 300 k. the gas constant for carbon dioxide is 189 j/lkg k) and has a specific heat ratio, k, of 1.289. isentropic expansion then occurs until the pressure is 200 kpa. a) determine the initial volume of co2 in m. b) determine the final temperature in k. c) determine the work done by the system during the expansion kl.
Answers: 2
image
Engineering, 04.07.2019 19:10, rayne40
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?
Find the Register A contents for the following program. LDAA #$7C
ADDA #$84
BEQ Over ;B...

Questions in other subjects: