Engineering
Engineering, 14.06.2020 01:57, rachanachannagiri

A rectangular channel is 400 ft wide and the normal depth is 10 ft with an average velocity of 5 fps. A roadway is to cross the channel using a bridge with equal encroachments from each side. Determine the water depth at Section 2 and 3 for bridge lengths (B) of 100, 150 and 200 ft. What is the maximum length of bridge that will cause critical depth to occur in the constriction

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, ahmedeldyame
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
Do you know the correct answer?
A rectangular channel is 400 ft wide and the normal depth is 10 ft with an average velocity of 5 fps...

Questions in other subjects:

Konu
Mathematics, 16.10.2020 05:01