Engineering
Engineering, 21.05.2020 04:10, ummitsjustjae

A concrete batch calls for the following quantities per cubic yard of concrete, based on saturated surface-dry conditions of the aggregate. Determine the required weights of each solid ingredient and the number of gallons of water required for a 6.5-cy batch. Also determine the wet unit weight of the concrete in pounds per cubic foot ( cement, 3,666 lbs; fine aggregate, 9,230 lbs; coarse aggregate, 11,960 lbs; water, 1,841 lbs; and wet unit weight, 152 pct).

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, leomessifanboy678
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
image
Engineering, 04.07.2019 18:10, soreese02
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:10, pjgolden04
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
Do you know the correct answer?
A concrete batch calls for the following quantities per cubic yard of concrete, based on saturated s...