Engineering
Engineering, 06.05.2020 01:38, bbjsmommy2014

Draw a Use- Map Diagram of the situation below:
Projects, Inc. is an engineering firm with approximately 500 engineers of different types. The company keeps records on all employees, their skills, projects assigned and departments worked in. New employees are hired by the personnel manager based on data in an application form and evaluations collected from other managers who interview the job candidates. Prospective employees may apply anytime .
Engineering managers notify the personnel manager when a job opens and list the characteristics necessary to be eligible for the job. The personnel manager compares the qualifications of the available pool of applicants (in the applicant file) with the characteristics of an open job and then schedules interviews between the manager in charge of the open position and the three best candidates from the pool.
After receiving evaluation on each interview from the manager, the personnel manager makes the hiring decision based upon the evaluations and applications of the candidates and the characteristics of the job, and then notifies the interviewees and the manager about the decision.
Applications of rejected applicants are retained for one year, after which time the application is purged. The personnel manager goes through the files each month to purge applications over one year old. When hired, a new engineer completes a nondisclosure agreement, which is filed with other information about the employee.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, keigleyhannah30
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 19:10, jimena15
10 kg of co2 is initially contained at 400 kpa and 300 k. the gas constant for carbon dioxide is 189 j/lkg k) and has a specific heat ratio, k, of 1.289. isentropic expansion then occurs until the pressure is 200 kpa. a) determine the initial volume of co2 in m. b) determine the final temperature in k. c) determine the work done by the system during the expansion kl.
Answers: 2
image
Engineering, 04.07.2019 19:10, Mimidj9279
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
Do you know the correct answer?
Draw a Use- Map Diagram of the situation below:
Projects, Inc. is an engineering firm with app...

Questions in other subjects:

Konu
History, 12.01.2021 23:20
Konu
History, 12.01.2021 23:20