![Engineering](/tpl/images/cats/User.png)
Engineering, 05.05.2020 22:36, ridgewoodschool88
Soil is to be excavated from a borrow pit to construct a 100-m-long trapezoidal levee that is 3 meters high, 5 meters wide at the top, and 15 meters wide at the base. The in situ total unit weight of the soil in the borrow pit is 21.7 kN/m3 with a water content of 11.4%. If levee construction requires the soil to be placed at a void ratio of 0.47, determine the volume that should be excavated from the borrow pit.
![answer](/tpl/images/cats/otvet.png)
Answers: 3
Other questions on the subject: Engineering
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factorĀ·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10, jrcspiderman2003
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?
Soil is to be excavated from a borrow pit to construct a 100-m-long trapezoidal levee that is 3 mete...
Questions in other subjects:
![Konu](/tpl/images/cats/biologiya.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
![Konu](/tpl/images/cats/informatica.png)
Computers and Technology, 01.02.2021 22:00
![Konu](/tpl/images/cats/fr.png)
French, 01.02.2021 22:00
![Konu](/tpl/images/cats/himiya.png)
![Konu](/tpl/images/cats/mat.png)
Mathematics, 01.02.2021 22:00
![Konu](/tpl/images/cats/mat.png)
Mathematics, 01.02.2021 22:00
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/fizika.png)
![Konu](/tpl/images/cats/biologiya.png)
Biology, 01.02.2021 22:00