A project requires transporting 13,000 cy of sand using (12) - cy dump trucks. A front-end loaded will load trucks at a rate pf 95 cy / hr. The trucks will transport the sand (7) miles at an average haul speed of 30 mi / hr, return speed of 40 mi / hr, and dump time of (3) minutes. Assume a (45) min effective hour for all equipment. (a) Calculate the number of trucks required to balance the production rate of the loader and (b) estimate the time to transport the sand based on the calculated number of trucks.

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, tjeffers90028
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:10, pjgolden04
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
Do you know the correct answer?
A project requires transporting 13,000 cy of sand using (12) - cy dump trucks. A front-end loaded wi...

Questions in other subjects:

Konu
Mathematics, 23.07.2020 03:01
Konu
Mathematics, 23.07.2020 03:01