Engineering
Engineering, 23.04.2020 19:31, sweetbee633

17. Which of the following is most often added to safety glasses to provide
better protection from impact and flying particles?

A. Infrared lenses
B. Scratch resistant coating
C. Side shields
D. Glass lenses

Mark brainliest

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 02:30, sandy2597
Precipitation hardening can be achieved in many light alloys by a three-step heat treatment. what is carried out and what is the purpose at each step? why is such a treatment necessary based on the nucleation and growth theory of phase transformation. compare this treatment with tempering martensite for carbon steels (similarities and differences).
Answers: 1
Do you know the correct answer?
17. Which of the following is most often added to safety glasses to provide
better protection...

Questions in other subjects:

Konu
Mathematics, 01.06.2021 19:30
Konu
Chemistry, 01.06.2021 19:30
Konu
Mathematics, 01.06.2021 19:30