Engineering
Engineering, 21.04.2020 23:27, ketricduggerp2ciuc

Open the"stateData3.c" program and try to understand how the tokenization works. If you open the input file "stateData. txt", you can clearly seethat a comma separates the state name and its population. The tokenizer portion of the programs separates each line into two tokens and stores them into two different arrays. You need to display the arrayelements such that each line has a state and itspopulation. Also calculate the total population of USA. Then, examine the portion of the code how it writes the array elements into a binary datafile. You need to write similar logic where it writes the array elements into a text file "stateDataOutput2.txt". Please check the syntax and usage of fprintf(); and use that here.

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, koolgurl2003
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
image
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Do you know the correct answer?
Open the"stateData3.c" program and try to understand how the tokenization works. If you open the inp...

Questions in other subjects:

Konu
Mathematics, 19.06.2020 08:57