Engineering
Engineering, 21.04.2020 15:54, luvcherie18

Based on the equals method for Circle objects defined in Section 6.1, what is the output of the following code sequence?

Circle c1 = new Circle(5);

Circle c2 = new Circle(5);

Circle c3 = new Circle(15);

Circle c4 = null;

System. out. println(c1 == c1);

System. out. println(c1 == c2);

System. out. println(c1 == c3);

System. out. println(c1 == c4);

System. out. println(c1.equals(c1));

System. out. println(c1.equals(c2));

System. out. println(c1.equals(c3));

System. out. println(c1.equals(c4));

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, BardiFan
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
image
Engineering, 03.07.2019 14:10, aliceohern
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
image
Engineering, 03.07.2019 23:20, abbz13
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Do you know the correct answer?
Based on the equals method for Circle objects defined in Section 6.1, what is the output of the foll...

Questions in other subjects: