Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2, 4 and 8 minutes. Their priorities are 3, 5, 2, 1 and 4 respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean turnaround time. Ignore any process switching overhead.

a) Round Robin
b) Priority Scheduling
c) First Come, first served (run in order A, B, C, D, E)
d) Shortest job first

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, EmilySerna
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
Do you know the correct answer?
Scheduling. Three batch jobs, A through E, arrive at a computer center at almost the same time. They...

Questions in other subjects:

Konu
Mathematics, 03.02.2020 18:52