Engineering
Engineering, 17.04.2020 03:30, katiemh8302

You have been hired to run a hydrogen production plant. The fixed cost (amortization of the equipment, and the buildings, salaries, taxes, etc.) amounts to cF=$2000/day regardless of how much hydrogen is produced. The electrolyzer consists of N cellsconnected in series, each having the characteristic, V=V0+RintI The utility will provide electric energy at a price, c(in $/kWh), that can vary from day to daydepending on availability. Each day you must adjust the hydrogen production rates , Hprod. rate(kg/day) so as to minimize the cost of the gas. To this end, you must develop a formula that tells you the optimal production rate as a function of c. Calculate the Hydrogen production rate that leads to the cheapest gas for the case in which there are 250 series connected cells, each one having the characteristic V=1.42+20*10-6I Do this for an electric energy cost of 2 cents per kWh. Thank you very much for your help

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, lowkeyqueenk
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
image
Engineering, 04.07.2019 19:10, kimmy6973
What is creep? what is stress relaxation?
Answers: 1
image
Engineering, 06.07.2019 03:10, betru12315
How to convert a friction to decimal ?
Answers: 1
image
Engineering, 06.07.2019 04:10, johnbobjones
Aheat pump that operates on the ideal vapor compression cycle with refrigerant-134a is used to heat water from 15°c to 45°c at a rate of 0.12 kg/s. the condenser and evaporator pressures are 1.4 and 0.32 mpa, respectively determine: (a) the power input to the heat pump
Answers: 1
Do you know the correct answer?
You have been hired to run a hydrogen production plant. The fixed cost (amortization of the equipmen...